Evaluating the Effectiveness of the Safety Investment Program (SIP) Policies for Oregon

Principal Investigator

Christopher Monsere, Portland State University Civil & Environmental Engineering

Co-Investigator(s)

Karen Dixon, Oregon State University

Final Report

OTREC-RR-10-11 Evaluating the Effectiveness of the Safety Investment Program (SIP) Policies for Oregon [January 2014]

Summary

The Oregon Department of Transportation (ODOT) Safety Investment Program (SIP) seeks to allocate safety funds in a manner that maximizes safety benefits on preservation projects and at specific high-crash locations. The SIP philosophy targets highway sections for investment with the premise that the most effective use of safety dollars to save lives is to invest in areas where the most people are being killed or seriously injured in traffic crashes. The SIP categorizes five-mile roadway sections on a 1-5 rating based on the number of crashes in a three year period; with five (5) being the most crash prone section.…

The Oregon Department of Transportation (ODOT) Safety Investment Program (SIP) seeks to allocate safety funds in a manner that maximizes safety benefits on preservation projects and at specific high-crash locations. The SIP philosophy targets highway sections for investment with the premise that the most effective use of safety dollars to save lives is to invest in areas where the most people are being killed or seriously injured in traffic crashes. The SIP categorizes five-mile roadway sections on a 1-5 rating based on the number of crashes in a three year period; with five (5) being the most crash prone section. Safety funds are then assigned based on these ratings and may be used for stand-alone as well as 3R safety-based expenditures; however, ODOT does not have a program in place to assess of the actual influence these investments on the overall safety improvements of the corridors. There is some uncertainty as to whether SIP policy encourages the most cost-effective use of limited resources and whether it effectively sorts road segments requiring safety improvements and those where standards can be reduced. While nearly $140 million has been allocated through SIP since its inception, there currently is no system in place to track investments and results. Since SAFETEA-LU calls for a data driven decision process, there is a need for ODOT to address how best to invest in safety and assess these investments using some type of performance measure based system. In this research, a comprehensive evaluation will be designed to evaluate the SIP program and recommend appropriate policy and performance measurement changes.

↓ expand text

Project Details

Year: 2008
Project Cost: $120,000
Project Status: Completed
Start Date: October 1, 2007
End Date: September 30, 2008
Theme:
TRB RiP: 27090

Share:   Tweet This!

Search Research Projects and Reports



OTREC by the Numbers

  • Total value of projects funded: $12.2 million
  • Number of projects funded: 153
  • Number of faculty partners: 98
  • Number of external partners participating in OTREC: 46

Download pdf »